25.9.08

The renovation begins:

Before

We took out our front closet so that we could install additional cabinets and a bar area
We would have botched the job miserably without the help of our dad- Scott. Thanks for spending your weekends with us!
It took us 3 months to get this fridge and as you can see, the door opens the wrong way. After much drama and hours on the phone, we returned it and bought a much better fridge which arrived 2 weeks later

Our cabinets waiting to be installed!

The upper cabinets are in!

2 comments:

  1. so fun! I can't wait to see the final look. :-)

    ReplyDelete
  2. man i remember those days:) have fun!!

    ReplyDelete